Who we serve

We serve commercial construction. Two kinds of it.

Bid work. Contracts that carry retainage, progress billing against a schedule of values, and a surety who decides how much you can take on. That is the whole of what we do, and it is why the reporting looks nothing like a general accountant's.

A site supervisor and a contractor reviewing work on a commercial site

The engagement

Same discipline, two different constraints

Both run the same reporting and buy from the same catalog. What separates them is who is setting the terms: a surety deciding how much work you can carry, or the general contractor above you deciding whether your paperwork is good enough to pay. Note that a bonded specialty sub belongs on the left, not the right.

A surety sets your ceiling

Commercial Contractors

General contractors and bonded specialty subs running bid work. Retainage, progress billing, AIA forms, and a surety who decides how much you can carry.

  • A work-in-progress schedule your surety can read
  • Cash forecast built on your draw and retainage schedules
  • Contract margin against estimate while the job is still open
  • Subcontractor documentation before the audit, not during it
See the commercial engagement

A general contractor sets your terms

Working Under a GC

Subcontractors taking work under real general contractors for the first time. Retainage, pay applications, change orders and prequalification, all arriving at once.

  • G702 and G703 that tie to the schedule of values
  • Retainage tracked by contract, so you know what is out
  • Change orders logged as performed and unapproved
  • Books that survive a prequal packet
See what fixes it

Not sure, or you have just taken your first bonded job? That is the most common place to be. Answer six questions from memory, without opening your books, and you will know whether this is your engagement yet. No email, nothing collected, about a minute.

By trade

The trades this reaches

Specialty subs working under a general contractor run the same reporting a GC does, at smaller scope. Retainage, a schedule of values, change orders performed and not yet approved, and prequalification that turns on what your statements can show.

  • Mechanical
  • Electrical
  • Concrete
  • Steel
  • Glazing
  • Fire protection

Start by finding out where you stand.

The exposure test takes about a minute and tells you straight. If you are not carrying enough contract complexity for this to earn its keep yet, we would rather say so than sell you an engagement you do not need.